Thursday 14 June 2012

Piping

All the pipes now reconnected to seacocks.

Heads hoses replaced in aft heads... The old one were in terrifyingly poor condition and weren't connected... the new ones still aren't connected until I mount the toilet, but at least aren't going to fall apart on me!

The sinks are also now teed into existing through hulls rather than draining into the bilges!

I'm now starting to mount the bilge pumps... Plinth glassed in and waiting to cure... Cant mount the aft one... needs a little water pumping out and as its below the engine its very slightly oily, so need to be afloat...

Other than that... ready to launch tommorrow... Weather permitting.... Looks like a decent weather window in the morning... we'll see!

No comments:

Post a Comment